Contruction Works include:

  • Improvement of the entrance to Kornos from Limassol to Nicosia length 480m (axis M1)
  • Improvement of the exit to Nicosia, length 480m (axis M2)
  • Construction of a new exit to Limassol, length 657m, (axis M3)
  • Construction of infrastructure for the installation of road lighting

Within the framework of the project, the necessary works will be carried out for the drainage of rainwater as well as relocations and / or extensions of networks of utilities.

ΚΠΣ/32/2020/Ε(Α)

Information

SQUARE METERS:

1.6km

SIGNATURE OF CONTRACTS:

March 2021

STARTING DATE:

April 2021

EXPECTED COMPLETION:

July 2022

LOCATION:

Kornos

VALUE OF PROJECT:

€1.185.000