Generic selectors
Exact matches only
Search in title
Search in content

Construction of Dual Carriage-way- Ayios Ilarionas-Nicosia

01/05
02/05
03/05
04/05
05/05

Key info

Project Overview

Construction of Ayios Ilarionas Avenue in Nicosia

Contract No. PS/C/631

Complete reconstruction and upgrade of an existing road of two lanes of traffic 1.5 km long in four lanes of separate traffic with sidewalks and bicycle path. It also includes reconstruction of sections of parallel and vertical local roads, with a total length of approximately 3.8 km.
Upgrading works include construction of a rainwater drainage system, undergrounding of all utilities and telecommunications systems, installation of modern street lighting, reconstruction of the water supply system including the main water supply pipeline with a diameter of 400 mm (Ductile iron system) Installation of green area watering system, road markings and other related work.

Information

SQUARE METERS:

3.8km

SIGNATURE OF CONTRACTS:

February 2011

STARTING DATE:

May 2011

COMPLETED:

April 2012

LOCATION:

Nicosia

VALUE OF PROJECT:

€4.576.000

Similar Projects

Cyfield GroupSEARCH PROPERTIES Cyfield Group