A 78m high, 21 – storey concrete frame building with two service basements and an underground parking.

The Project’s works consisted of:

  • The construction of the concrete frame and the envelope of the building. The construction of the Concrete frame included the following:
    • The structural frame – concrete retaining walls, H-beam walls, piling, excavation, raft foundation, basement concrete walls, electromecahnical (1st fix) installations, soil improvements and basement slabs , ground floor , mezzanine floor, nineteen floors and staircase roof – concrete structure.
    • The completion of the envelope (curtain wall, aluminum works (windows and sliding doors)
    • The metal structure and metal stairs
    • The electromechanical works (1st fix)
    • The waterproofing of the basement walls and basement slab
    • The external works.
  • Health and safety of the works

Information

STARTING DATE:

December 2015

EXPECTED COMPLETION:

May 2018

LOCATION:

Nicosia